May 18, 2024

Report Wire

News at Another Perspective

Odisha-Andhra hyperlink disrupted amongst torrential rains

2 min read

By Express News Service

MALKANGIRI: Communication between Malkangiri and Andhra Pradesh on National Highway-326 stays disrupted from Tuesday morning as water from swollen rivers flowed at 4-5  toes excessive over the low-lying Koigur bridge in between Motu and Chintur in Andhra Pradesh following torrential rains for the previous three days. Hundreds of autos and folks have remained stranded on each side of the bridge until reviews final got here in.

Commuters on Malkangiri and Motu highway had been additionally affected as communication was disrupted for hours on Tuesday morning as rainwater was flowing at 4 toes excessive over the bridge at Kangrukonda on NH-326 below Kalimela block limits. Similarly, Kalimela and Podia remained cut-off with  3-4 toes water submerging the bridge close to Kalimela Kanyashram below Kalimela limits. 

However, communication was resumed within the afternoon because the water stage receded in each locations.
The state of affairs was no completely different in MV-70 and Gorakhpalli in Kalimela block the place there was no communication until water stage receded.

Even interstate communication between Malkangiri and Chhattisgarh remained suspended until Tuesday afternoon as rainwater was flowing at greater than 4 toes over Chhapra bridge at Sukma. District Emergency officer right here knowledgeable that Malkangiri district has obtained a mean rainfall of 32.09 mm in the course of the previous 24 hours.

MALKANGIRI: Communication between Malkangiri and Andhra Pradesh on National Highway-326 stays disrupted from Tuesday morning as water from swollen rivers flowed at 4-5  toes excessive over the low-lying Koigur bridge in between Motu and Chintur in Andhra Pradesh following torrential rains for the previous three days. Hundreds of autos and folks have remained stranded on each side of the bridge until reviews final got here in.

Commuters on Malkangiri and Motu highway had been additionally affected as communication was disrupted for hours on Tuesday morning as rainwater was flowing at 4 toes excessive over the bridge at Kangrukonda on NH-326 below Kalimela block limits. Similarly, Kalimela and Podia remained cut-off with  3-4 toes water submerging the bridge close to Kalimela Kanyashram below Kalimela limits. 

However, communication was resumed within the afternoon because the water stage receded in each locations.
The state of affairs was no completely different in MV-70 and Gorakhpalli in Kalimela block the place there was no communication until water stage receded.

Even interstate communication between Malkangiri and Chhattisgarh remained suspended until Tuesday afternoon as rainwater was flowing at greater than 4 toes over Chhapra bridge at Sukma. District Emergency officer right here knowledgeable that Malkangiri district has obtained a mean rainfall of 32.09 mm in the course of the previous 24 hours.

Copyright © 2024 Report Wire. All Rights Reserved