Report Wire

News at Another Perspective

Sabarmati riverfront to get longer with open gyms, eating places

3 min read

The Sabarmati riverfront, considered one of Ahmedabad’s most defining landscapes which has hosted a minimum of three heads of state, is ready to get longer and greener, providing an uninterrupted view of the river on each its west and east banks.
Tenders for a 1-km pilot of Phase 2 of the riverfront challenge had been floated just lately, with the Ahmedabad Municipal Commissioner’s draft price range tabled on Wednesday allocating Rs 1,050 crore for the brand new stretch.
Work on the 11-km-long Phase 1 of the riverfront — extending from Vasna Barrage to Torrent energy home on the west aspect and to Dafnala on the east — was carried out in phases, with the final stretch accomplished in 2016.
The new stretch, almost 6 km lengthy, will prolong the river entrance on each banks of the Sabarmati river as much as Indira Bridge, with roads connecting Narendra Modi stadium on the west financial institution and the world heritage metropolis on the east financial institution.
Plans within the new section embrace an “international park” to showcase “green wealth from different countries”, a ferry service and probably even a water taxi, mentioned Keshav Verma, chairman of the Sabarmati Riverfront Development Corporation Ltd (SRFDCL), town company’s Special Purpose Vehicle (SPV) launched in 1997 to execute the challenge.
Unlike Phase 1 of the riverfront, the place a gray retention wall prevents a transparent view of the river, the brand new stretch, say officers, will provide an uninterrupted view of the Sabarmati.
Varma mentioned that with town’s “centre of gravity shifting to the riverfront”, many builders are displaying curiosity. “But we are being very careful. We want only those people who fit into our masterplan.”
“Covid has taught us the interdependence of environment and health. The river should be a source of happiness, a stress buster, and it has to be clean. Congested spaces need to be replaced with open spaces and wide footpaths. Thus, this will not be a car-centric development but an ecosystem with shaded pathways where the pedestrian is dominant,” mentioned Varma.
While officers estimate that the challenge shall be prepared in about 4 years, Varma mentioned that with the market nonetheless not conducive submit Covid, they’re in no rush to develop.
This new stretch shall be at three ranges — an elevated street on high, adopted by areas for markets and eating places and cultural centres, after which the promenade.
City-based architect and concrete planner Bimal Patel, whose agency HCP Design Planning and Management Private Limited (HCPDPML) is designing the second section of the riverfront, mentioned, “For the second phase, since the two sides have less development, the river width is more and thus there is wider land to reclaim. This will offer new opportunities to create a new stepped landscaped embankment.”
Patel’s agency can be designing the Central Vista challenge within the Capital.
As a part of the ‘stepped landscaped embankment’, the promenades are being designed in numerous layers to facilitate a transparent view of the river from any of those layers.
The promenade with a devoted walkway and cycle monitor shall be closest to the river, adopted by a second one which shall be a inexperienced belt, mentioned Varma. Officials mentioned in addition they plan to develop 2.35 lakh timber on each the east and west sides of the riverfront.

Though the variety of layers or promenades would range at totally different stretches, one of many layers will function sports activities modules, with sports activities actions starting from mountaineering to open gymnasiums each 200-300 metres. One of the promenades will even have leisure amenities resembling libraries and eating places, with ramps and large footpaths to hyperlink the promenades.
Patel mentioned an added benefit in Phase 2 of the riverfront challenge is that not like Phase 1, this received’t contain rehabilitation or relocation “since there is nearly no slum habitation on either side”. Around 10,500 riverbank slum models had been relocated in Phase 1.

Besides the 6-km stretch in Phase 2, the SRFDCL has invited bids to develop a one-km stretch alongside the Ahmedabad cantonment space. Patel mentioned that whereas this stretch was a part of the primary section, it couldn’t be developed due to “land acquisition issues as it is under Ministry of Defence”.
Prime Minister Narendra Modi has hosted three heads of state on the Sabarmati riverfront, starting with Chinese president Xi Jinping in 2014, Japanese premier Shinzo Abe in 2017 and Israeli Prime Minister Benjamin Netanyahu in 2018.